Solar panels and battery storage system at industrial scale
Case study

Zero-CAPEX BESS + PV
for an industrial site.

An anonymised case study illustrating how industrial sites can reduce electricity costs, monetise available site capacity, and transfer capital, technology and merchant-market risk away from the host.

Industrial energy infrastructure and renewable installation
The work

Anonymised case
study for an
energy-intensive site.

CurvatureInvest analysed one year of interval consumption data, reconstructed the existing PV profile, tested BESS and PV configurations, and structured a zero-CAPEX solution funded by an investor-backed project vehicle.

ConfigurationBESS + PV
StructureZero-CAPEX
Host profileEnergy-intensive
Download full case study (PDF)
What it illustrates

Three outcomes
delivered.

The case shows how a structured engagement converts an analysis into a deliverable proposition for an industrial host.

— 01

Reduced electricity costs

Optimisation of the host's load profile through BESS dispatch, peak-shaving and PV self-consumption.

— 02

Monetised site capacity

Use of available rooftop, land or grid-connection capacity that would otherwise remain unproductive.

— 03

Risk transfer

Capital, technology and merchant-market risk transferred to an investor-backed project vehicle.

Methodology

How the analysis
was built.

The case study was developed by working backwards from the host's actual consumption profile, then forwards into structuring options that align with both the technical reality and the host's commercial preferences.

  • 01 One year of interval consumption data analysed
  • 02 Existing PV profile reconstructed
  • 03 BESS and PV configurations tested
  • 04 Zero-CAPEX structure built around investor-backed vehicle
Energy data analysis dashboard
Apply it to your site

A similar analysis
for your project?

Share 12 months of interval consumption data and recent electricity invoices. CurvatureInvest will review and provide an initial view on relevance.

Request assessment